Adaptive Engineering AXR Especificaciones Pagina 5

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 26
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 4
- 5 -
Current Version Date: June 2011
5
5. OPERATING INSTRUCTION PICTOGRAMS
TO MOVE LIFT
1. Crank lift onto
wheels.
2. Pull handles down to
release brake.
3. Push lift to aircraft.
4. Extend outriggers.
5. Crank to lower
outriggers.
TO RAISE LIFT
1. Lower ground ramp,
then board lift.
2. Raise and latch
ground ramp.
3. Crank lift up
above sill height.
4. Extend bridge ramp
into doorway.
5. Lower bridge ramp
onto sill of door until
gate opens.
REVERSE STEPS FOR
OFF-LOADING.
NOTE
The decals on the lift may refer to the platform as thedeck”.
Vista de pagina 4
1 2 3 4 5 6 7 8 9 10 ... 25 26

Comentarios a estos manuales

Sin comentarios